Convictions that make us inconvenient

Not a manifesto for the front page, but the list of reasons we argue with clients in week two. Better read beforehand than discovered afterwards.

1. Infrastructure you cannot wipe and rebuild is an exhibit

The test is simple and the answer is usually known immediately: if the environment were deleted entirely, how long until it returns, and by whose hands? When the answer is «well, Mike would put it back, he remembers», you do not have infrastructure. You have a historic building everybody is afraid to touch.

It does not follow that you should delete anything. It follows that every change in such a system is a bet without insurance, and that work there will always be slow, because people are instinctively and correctly cautious. We begin by making the environment rebuildable from nothing - not for elegance, but because it is the only way to stop being afraid.

2. A backup without a drill is a hope, not a backup

The clearest number we own: three years of daily copies, a green monitor, a zero exit code - and nineteen hours of data lost at the first real restore. The job verified that a command finished, not that the file held data. The whole story is in case 02.

So we do not sell «backup configuration». We sell a measured restore: how many minutes it takes, how much data is lost, and the date of the last drill. With no drill there is nothing to put in the report, however expensive the storage.

3. Reproducibility beats speed, and it pays back slowly

A build that turns one source into two different artefacts turns every debugging session into guesswork: you cannot tell whether the bug reproduces or whether you built something else. The first days after we switch the checks on look like a regression - the build fails more often than before. It did not get worse; it started finding what it used to drive past.

That conversation happens on nearly every project, usually at the end of week one, and it sounds like «things were more stable before you came». They were quieter. We expect the argument and consider it part of the job.

4. One change at a time, or you do not know what helped

When four things change in a week and the result improves, the team acquires four superstitions instead of one piece of knowledge. Six months later somebody removes the «unnecessary» one and breaks what was holding everything up. We have seen that often enough to make it a rule that is not negotiable during implementation.

5. A document only its authors read is not a document

Our handover test is strict and inconvenient for us: somebody who was not involved brings the environment up from the document while we sit beside them in silence. If they get stuck, the text is wrong, and we fix the text instead of talking them through it.

This irritates everyone, including us, because talking is faster. But «I explained it all» is not a work product. The work product is a page a stranger followed to the end.

6. We leave, and that constrains every choice we make

The most elegant solution a team cannot maintain without us is our mistake, not their shortcoming. So we routinely pick the simpler option over the better one: fewer layers, fewer inventions of our own, more things you can look up in documentation instead of asking us.

Hence the rule about an engineer on your side, and thirty days of written answers after handover instead of an operations retainer. If at the end of those thirty days there is nobody to maintain the result, we chose wrong - and that is a conversation to have with us, not a reason to hire us permanently.

7. We name what is NOT included as loudly as what is

This follows directly from billing per stage. When you are paid by the hour, an extra request is simply a little more money; when the price is fixed, every «while you are at it» eats our margin. So each service carries an explicit «not included» list, and we say it at the first meeting rather than in week two, when a refusal sounds like dodging.

8. We measure before and after with one instrument, or it is not a comparison

If «before» was timed with a stopwatch and «after» by feel, there is no improvement, only self-deception. In the release case we measured the same three numbers the same way before and after: minutes per release, the share of releases per quarter that rolled back, and minutes per rollback. Then the difference means something. An instrument that changes between measurements is the favourite way to show progress that did not happen.

9. One engineer on your side is a condition, not a courtesy

We refuse projects where the client has no engineer of their own, and it looks arrogant until you see how such projects end. With nobody to hand over to, in a quarter it all reverts, and we look like people who took the money and changed nothing. The rule protects the client’s result first and our reputation second.

Glossary

Words we use in a narrow sense, so the conversation stays precise.

RPO
How much data you are willing to lose in a failure, in units of time. «RPO 15 minutes» means: lose no more than the last fifteen minutes.
RTO
How fast you must be back in service. «RTO 45 minutes» is the upper bound on downtime, not the average.
Idempotence
The property of an operation giving the same result however many times it is applied. Building an environment from code must be like this.
Drift
The quiet divergence of the real state from what the code records. The chief enemy of infrastructure as code, and the cause of the incident in case 04.
Reproducible build
Two runs of one commit yield byte-identical artefacts. Checked by comparing checksums.
Dry run
Showing the difference a change will make before it is applied. Required on every change to state.
Rollback
Returning to the previous version as a routine operation. If it is an emergency and rare, it is not a rollback but heroics.
State lock
A lock on the state store that stops two people changing the same thing at once.

How this turns into stages and dates is on the work and services pages. If one of the six looks like an error to you, that is a good reason to write: half of them were formulated in exactly that argument.