About
Two engineers, Belgrade, since March 2021
Twenty-four projects carried to completion and eleven declined at the door. We do not intend to grow past four people.
Anton Grechin - infrastructure
Eleven years in operations: he started at a regional telecoms operator, then spent six years in hosting, responsible for client servers surviving moves between sites. Here since 2021.
On projects he owns the infrastructure description, the state store with its locking, the network and the order in which access is granted. He also writes the audit reports - long ones, with a «what we decided not to touch» section - and it was he who insisted on never starting work without an audit, after we twice began and twice redid our own work in 2021.
Irina Balash - builds, releases, data
Nine years, seven of them at a product company, where she went from «the person who fixes the build» to owning releases across several services. She arrived convinced that reproducibility is not an academic luxury and has not revised that in five years.
She owns builds, releases, rollback, backups and restore drills. The drill script we published openly on 24 September 2026 is hers, rewritten twice after strangers had worked through it.
Why there are two of us
We met in 2019 on somebody else’s project, where we were both brought in «for two weeks». It ran seven months, and those months made it clear that working as a pair on one project at a time is not a compromise but the arrangement we both want.
A third and fourth person are possible; a fifth is not, because with five we would be doing sales and management rather than infrastructure. The direct consequence for you: never more than two projects at once, and sometimes an answer of «free from this date» instead of «let us start next week».
How it works inside
- No office. Two flats ten minutes apart on foot, and one table in a café where plans get argued over.
- Both of us work every project, with no split into lead and second. One writes a change, the other reviews it before it reaches your repository.
- No document goes to a client unread by the other. This is why an audit report arrives a day later than it could.
- The Friday report is written by whoever was less involved that week, so we both stay current instead of dividing territory.
Timeline
- March 2021
- Registered the practice in Belgrade. The first two months were worked for food and references, one of which we still use.
- January 2022
- Introduced the rule: no work without an audit. Before it, we twice started from somebody else’s plan and twice redid the result at our own cost.
- June 2023
- Stopped taking projects where the client has no engineer of their own. Two projects from 2022 had by then reverted to their original state - there had been nobody to hand over to.
- April 2024
- Wrote the first version of the restore drill template and began installing it for everyone whose backups we touch.
- October 2025
- Dropped hourly billing for a fixed price per stage. Arguing about hours was taking longer than some of the work.
- 24 September 2026
- Published the restore drill template openly, with documentation and a sample report, after stripping everything specific to clients.
A few numbers
As of 1 October 2026: 24 projects completed, 11 declined before work began and 8 that the client chose to end at the audit. The shortest took 5 days, the longest 9 weeks. Counted by us, from our own invoices.
Language and hours
Correspondence and documents in English or Russian, whichever you prefer; our Serbian is conversational and we do not offer it for documents. We live and work on central European time, with a working window of 10:00 to 18:00. Mail that arrives outside it gets read but answered in working hours, and we ask the same of you during a project.
What this adds up to in practice is visible in case 02: that is our report with bad news in it.